About the project
The Angstrem-T production building in Zelenograd was built for submicron semiconductor manufacturing and belongs to facilities with the most demanding utility infrastructure requirements.
Simetra's scope on this project included: detailed design documentationrnInstallation works.
The documentation package was produced in line with regulatory requirements and delivered to the customer on schedule.
Have a similar task?
Tell us about your facility — we will propose a solution and estimate the scope.