+7 (495) 269-49-91 info@simetra-eng.ru
Contact manager

Automatic control system for the GTES gas treatment unit

Russia, Republic of Crimea, Krasnoperekopsk

Automatic control system for the GTES gas treatment unit

About the project

The gas turbine plant in Krasnoperekopsk runs on treated natural gas; the automatic control system of the gas treatment unit maintains the specified fuel parameters.

Simetra's scope on this project included: detailed design documentation, supply, software developmentrnInstallation and commissioning works.

The project was executed in line with the requirements for hazardous production facilities of the oil and gas industry.

Have a similar task?

Tell us about your facility — we will propose a solution and estimate the scope.

Consultation

Describe your task — we will prepare a commercial proposal
with a preliminary cost estimate within 2 business days

Click to upload files from your computer

Any files — up to 20 MB each

0%

Uploaded files