The 45,000-seat Mordovia Arena in Saransk was built for the 2018 FIFA World Cup; the 6300/6/10 kV transformer substation is the energy heart of the arena.
Simetra's scope on this project included: detailed design documentation: process automation, relay protection, data transmission, energy metering.
The project expanded the company's ICS track record: from control algorithm development to commissioning the system into commercial operation.
Have a similar task?
Tell us about your facility — we will propose a solution and estimate the scope.