About the project
The Taman bulk cargo terminal is a deep-water Black Sea port with highly power-intensive handling facilities.
Simetra's scope on this project included: detailed design documentationrnAssembly and supply of Form 3b main switchboard cabinets (210 pcs) rated up to 5,000 A.
The equipment was manufactured to the design documentation and fully tested before shipment, minimizing installation time on site.
Have a similar task?
Tell us about your facility — we will propose a solution and estimate the scope.