About the project
The temporary 12 MVA power center in Yekaterinburg was delivered turnkey: from the complete documentation package to installation and control system programming.
Simetra's scope on this project included: development of a complete set of design and detailed documentationrnTurnkey construction of a temporary power center.
Work at power generation facilities requires strict compliance with industry codes — the project was completed and accepted by the customer without reservations.