Commissioning works

Integrated equipment commissioning

We put equipment into operation — from installation checks to turnkey handover of a working system.

Simetra Group performs commissioning at industrial, power and transport infrastructure facilities. Adjustment covers every level: from control circuit checks and sensor calibration to starting process equipment in automatic mode and handing the system over to operation. We work both with equipment we supplied and with systems from other manufacturers and contractors.

Our key advantage is an end-to-end team. The engineers who developed the documentation and wrote the software go to site for commissioning themselves. This shortens start-up, eliminates information loss between stages and allows program changes to be made right on site without bringing in another contractor.

  • 200+

    commissioned facilities
    in the portfolio

  • 15+

    years of commissioning
    practice

  • 9

    system commissioning
    areas

About us

We can work under any project conditions: with third-party equipment, staged start-up, alongside process engineers, or within an integrated contract.

Automation system commissioning

Commissioning areas

Industrial and traffic control systems, drives, dispatch, security and video surveillance — integrated commissioning of all facility engineering systems.

ICS

Industrial process control systems

  • Automation cabinet installation checks, cable continuity testing, power and control circuit checks
  • Calibration and setup of field instruments: pressure, temperature, flow and level sensors
  • Loading and debugging the controller application, verifying control logic against the procedure
  • Analog and discrete I/O channel setup and checks, signal scaling
  • Trial runs in manual mode, then sequential start-up in automatic mode
  • Alarm, interlock setpoint and protective trip configuration
  • Test reports and system handover to the customer with a completion certificate
TMS

Automated traffic management systems

  • Adjustment of traffic light controllers and variable message signs
  • Traffic flow detector setup: loop, video and radar detectors
  • Verification of integration with the central control room and data exchange protocols
  • Start-up of the road condition monitoring system and real-time data transfer checks
  • Adaptive control and coordinated arterial signal timing setup
  • As-built documentation and facility passports compiled and handed to the customer
Send a request
DISPATCH

Dispatch and monitoring systems

  • Dispatch-level server and network equipment setup
  • Communication link checks between field equipment and the control room
  • SCADA setup: mimic diagrams, trends, archives, alarms
  • Verification of process parameter display accuracy on operator stations
  • Access control and operator action logging setup
  • Customer personnel training on the dispatch software suite
Send a request
DRIVES

Drive equipment

  • Variable frequency drive adjustment: parameterization, protection setup, current and speed characteristics
  • Motor start-up and operation checks in manual and automatic modes
  • Drive-to-automation communication interface setup (Profibus, Profinet, Modbus)
  • Soft starter setup, start and braking mode checks
  • Drive interlock checks, pump and fan redundancy algorithm setup
  • Drive testing as part of the process system, load parameter measurement
Send a request
ACS

Access control systems

  • Start-up and setup of access point controllers, card readers and biometric devices
  • Access control software configuration: zones, schedules, access levels
  • Employee database population, card and identifier setup
  • Integration of access control with intrusion alarm and video surveillance
  • Operation checks of turnstiles, barriers, electromagnetic locks and closers
  • Verification of response algorithms to unauthorized entry attempts and alarm events
Send a request
ALARM

Security and fire alarm systems

  • Control panel setup, addressable and analog alarm loop configuration
  • Detector checks and setup: smoke, heat, manual call points, perimeter
  • Start-up of evacuation notification systems: zone and priority configuration
  • Integration with fire suppression, smoke extraction and fire damper systems
  • System checks in standby mode and with simulated alarms, test reports
  • Test program and procedure development, acceptance testing with the customer’s representatives
Send a request
CCTV

Video surveillance systems

  • IP and analog camera setup: resolution, frame rate, exposure, field of view
  • Video recorder and video management system (VMS) configuration
  • Video analytics setup: motion detection, line crossing, license plate recognition
  • Verification of video archiving and retention per customer requirements
  • Integration with access control and intrusion alarm to link video to events
  • Power and video stream channel redundancy checks, system handover to the customer
Send a request
I&C

Instrumentation

  • Installation checks and individual trials of measuring instruments before start-up
  • Instrument verification and calibration on site or via external verification
  • Setup of analytical and process instruments: gas analyzers, Coriolis flow meters, level gauges
  • Custody transfer metering unit checks: schematic compliance, sealing, passports
  • Instrumentation register with assigned tags and test results
Send a request

Simetra Group presentation

A detailed overview of the company’s services, manufacturing capabilities, completed projects and technical competencies in a single PDF document.

Download PDF

Questions about commissioning

At what construction stage should your team join for commissioning?

Ideally at the installation stage, so commissioning engineers can oversee cable routing, sensor placement and installation compliance with the detailed documentation. This catches discrepancies before the cables are finally sealed in and substantially shortens the actual commissioning. If needed, we start after installation is complete — in that case we begin with an incoming installation inspection and a punch list.

Do you commission equipment supplied by other contractors?

Yes. We adjust equipment from other suppliers provided the necessary technical documentation is available: diagrams, operating manuals and software. In some cases, where the controller software is password-locked by the manufacturer or a subcontractor, the adjustment scope may be limited — such situations are agreed at the commissioning specification stage.

What does the as-built documentation include?

On completion we hand over a full as-built package: installation check reports, individual equipment test reports, commissioning certificates for each system, the test program and procedure, and the commissioning log. The package contents are agreed with the customer at the start and can be extended to meet the requirements of the operating organization or supervisory authorities.

How do you work when the facility is put into operation in stages?

We draw up a commissioning plan broken down by start-up phases and agree it with the general contractor and the customer. Priority goes to systems needed to begin process trials: power supply, ICS for critical units, security systems. Other systems are commissioned as construction and installation progress. This lets process trials start without waiting for all work on site to finish.

Do you run integrated process equipment trials together with process engineers?

Yes. Integrated trials — the final commissioning stage — are conducted together with the customer’s process personnel. At this stage the control system is verified under real process conditions: control algorithm correctness, measurement accuracy, and the response of protections and interlocks to abnormal situations. Based on the results, the controller program and instrument setpoints are refined where needed.

Can commissioning be part of an integrated contract with design and installation?

Yes, it is our preferred arrangement. Having one team handle design, equipment supply, installation and commissioning reduces risks at stage interfaces, speeds up technical decisions and shortens overall project delivery. In that case the commissioning engineer is involved from the documentation stage and knows the system architecture inside out by the time they arrive on site.

Consultation

Describe your task — we will prepare a commercial proposal
with a preliminary cost estimate within 2 business days

Click to upload files from your computer

Any files — up to 20 MB each

0%

Uploaded files