About the project
The 110 kV substations of MRSK Volga — Mordovenergo are key nodes of the regional distribution grid; the telemetry upgrade migrates them to modern SCADA protocols.
Simetra's scope on this project included: telemetry system upgrade at the 110 kV Ardatov substationrnTelemetry system upgrades at the 110 kV Atyashevo and GKS substations.
The monitoring system gives the operations team an objective picture of equipment condition and enables condition-based maintenance planning.
Have a similar task?
Tell us about your facility — we will propose a solution and estimate the scope.