+7 (495) 269-49-91 info@simetra-eng.ru
Contact manager

Reconstruction of the 6/110 kV power supply system at the Kama pulp and paper mill. Total consumer load 80+50 MW

Russia, Perm Krai, Krasnokamsk

Reconstruction of the 6/110 kV power supply system at the Kama pulp and paper mill. Total consumer load 80+50 MW

About the project

The Kama pulp and paper mill in Krasnokamsk has a total consumer load of 80+50 MW. The 6/110 kV power supply reconstruction affected the mill's main supply scheme.

Simetra's scope on this project included: design and detailed documentation for power supply.

The documentation package was produced in line with regulatory requirements and delivered to the customer on schedule.

Have a similar task?

Tell us about your facility — we will propose a solution and estimate the scope.

Consultation

Describe your task — we will prepare a commercial proposal
with a preliminary cost estimate within 2 business days

Click to upload files from your computer

Any files — up to 20 MB each

0%

Uploaded files