The temporary 12 MVA power center in the Chelyabinsk Region was built to quickly cover the capacity deficit of an industrial consumer during the reconstruction of the main power supply scheme.

Simetra's scope on this project included: development of a complete set of design and detailed documentation.

The project strengthened the company's position in distributed and industrial power generation.